Metals & Minerals News

Fulcrum signs pilot plant contract for Teck-Hughes

Fulcrum Metals plc has signed a contract for a standalone pilot plant to process material from the Teck-Hughes gold tailings project in Ontario, Canada. COMMERCIAL Test Design Implement Solutions LLC (TDI)’s plant will process 2.4 tonnes of material per day, and use Extrakt Process Solutions’ cyanide-free technology to recover metals from mine waste. The plant […]

Equipment & Logistics Metals & Minerals News

Alba advances more than 8m at Llechfraith

Alba Mineral Resources plc has completed six successful blasts, advancing 8.1 metres, at the Llechfraith priority gold target, on level five at Clogau-St David’s gold mine in Wales. THROUGHPUT Executive chairman George Frangeskides said that the company was on course to complete around 20m of development by Easter. The current phase of operations has resulted […]

Metals & Minerals News

GreenRoc plans bulk sampling at Amtisoq

GreenRoc Strategic Materials plc aims to collect a 15 to 20 tonne bulk sample during an approved summer field programme at its Amitsoq graphite project in southern Greenland. PLANT Local firm HK Transport in Qaqortoq, will collect the sample underground from the Lower Graphite Layer ore body in the historical mine workings. The work is […]

Metals & Minerals News

Alba notes results from pilot processing plant at Clogau gold mine

Alba Mineral Resources plc said it had received notable results from its first assay on bulk sample concentrates produced at its pilot processing plant at Clogau-St David’s gold mine, North Wales. The underground bulk samples were collected during October 2020 with the first bulk sample taken from previously worked areas of the mine. The junior […]

Metals & Minerals News

Alba restarts surface drilling at Clogau

Alba Mineral Resources plc has restarted surface drilling to test the depth extent of the new vein system at its Clogau-St David’s gold mine project in North Wales. PLANT Drilling contractors are preparing the drill collar for LL005 which will have a steeper trajectory of -55° to obtain a deeper lode intersection around 20m below […]