Metals & Minerals News

Fulcrum signs pilot plant contract for Teck-Hughes

Fulcrum Metals plc has signed a contract for a standalone pilot plant to process material from the Teck-Hughes gold tailings project in Ontario, Canada. COMMERCIAL Test Design Implement Solutions LLC (TDI)’s plant will process 2.4 tonnes of material per day, and use Extrakt Process Solutions’ cyanide-free technology to recover metals from mine waste. The plant […]

Metals & Minerals News

Fulcrum reveals more metals at Teck-Hughes

Fulcrum Metals plc returned several metals, including “critical and technology” minerals, from auger drilling at the Teck-Hughes gold tailings project in Kirkland Lake, Ontario. PRODUCTION Results from the expanded programme for 159 holes revealed average grades from surface of 0.63 grams per tonne gold, 0.70g/t silver, 12.86g/t tellurium and 17.12g/t gallium A “growing suite” of “critical and technology […]

Metals & Minerals News

Fulcrum begins pilot plant study for tailings projects

Fulcrum Metals plc has started a commissioned pilot plant scoping study, with Test Design Implement Solutions LLC, to improve work at its Teck Hughes and Sylvanite gold tailings projects in Kirkland Lake, Ontario. DE-RISK TDI will be assisted by Extrakt Process Solutions LLC and Bechtel Energy Technologies & Solutions, Inc. The move follows assessment of phase III […]